Logo
File #: 9042-17    Version: 1
Type: Briefing/Report (Dept,BCC) - Action Requested Status: Agenda Ready (BCC)
File created: 1/24/2017 In control: Transportation Board
On agenda: 2/2/2017 Final action:
Title: North Mesa Phase 1 Improvements Project
Presenters: Eric Martinez
Attachments: 1. A - Presentation North Mesa Phase 1 Project

…Title

North Mesa Phase 1 Improvements Project

…Body

Proposed improvements include roadway reconstruction of the following streets:

                     Camino Uva (from San Ildefonso to the cul-de-sac), and

                     Camino Durasnilla (from San Ildefonso to Camino Uva). 

 

More specifically, the proposed work involves removal and replacement of asphalt surfacing, curb, gutter, sidewalks (at required locations), drive pads, ADA curb ramps, and drainage structures. 

…Attachments

A - Presentation