Approval of Services Agreement No. AGR19-49 with KLM Engineering, Inc. in the amount of $69,950.00, plus Applicable Gross Receipts Tax, for the Purpose of 2019 Water Tank Coating & Cathodic Protection Inspection
Recommended Action
I move that the Board of Public Utilities approve Services Agreement No. AGR19-49 with KLM Engineering Inc. in the amount of $69,950.00 and a contingency in the amount of $15,000.00, for a totalĀ of $84,950.00, plus applicable gross receipts tax, for the purpose of Water Tank Coating and Cathodic Protection Inspection.
Staff Recommendation
Staff recommends that the Board approve as presented.
Body
The short term (10-year) and long range (20-year) CIP program for Water Production includes the repainting of 8 existing water storage tanks. In addition, three new storage tanks are proposed to be added to the system over this same planning period. It is felt that having a professional team complete a coating inspection of all Water Production storage tanks, other than those that have been repainted within the past 10 years, will provide the sound scientific data necessary to properly prioritize the individual storage tank repainting projects within the CIP program.
The inspection program proposed within this agreement includes a structural inspection to verify if our existing storage tanks meet current codes for safety. It also includes gathering a small sample of the existing interior coating system to test for lead based paint. Knowing this information will allow us to better develop more accurate priority and budget estimates for the CIP program for each individual tank project.
16 of our existing storage tanks have cathodic protection equipment. This agreement also includes the inspection of each of our cathodic protection systems by a certified cathodic protection system tester. The final report will include any deficiencies that will allow us to develop recommendations for correction to bring each tank's ca...