Logo
File #: 4909-12    Version: 1
Type: Briefing/Report (Dept,BCC) - Action Requested Status: Approved
File created: 11/20/2012 In control: County Council - Regular Session
On agenda: 12/11/2012 Final action: 12/11/2012
Title: Phasing of NM502 Improvements Project.
Presenters: Philo Shelton; Kyle Zimmerman
Indexes (Council Goals): Quality of Life - Diversity, Equity, and Inclusivity
Attachments: 1. A. February 7, 2012 Council Meeting Minutes.pdf, 2. B. November 30, 2012 Letter from NMDOT.pdf, 3. C. February 7, 2012 - Option 1.pdf, 4. D. Proposed Revised Project Limits and Design.pdf, 5. E. Alternative Verde Ridge Access to DP Road.pdf, 6. February 7, 2012 Corrected Minutes.pdf
Title
Phasing of NM502 Improvements Project.
Suggested Motion
I move that Council direct staff to proceed with phasing the NM502 Improvement project as described in the attached Proposed Revised Project Limits and Design.
Administrator's Recommendation
The County Administrator recommends that Council approve the Proposed Revised Project Limits and Design as presented.
Board, Commission or Committee Recommendation
The Transportation Board met on December 6, 2012. Results from that meeting will be presented at the Council meeting.
Body
On February 7, 2012, staff gave Council a presentation on the NM502 design option for the section of DP Road to Airport Road. At the February 7 meeting, Council passed a motion that directed staff to relay to the New Mexico Department of Transportation (NMDOT) the County’s preference for Option 1. A copy of the February 7 Council Meeting Minutes is provided for reference (Attachment A).

In subsequent meetings with NMDOT, they expressed concerns about the traffic Level of Service (LOS) for the side streets Arroyo Lane and Sombrillo Court and asked for the LOS to be checked. The County’s Traffic Engineer calculated the LOS at the intersection of NM502 with Arroyo Lane and Sombrillo Court. LOS for a STOP controlled intersection is based on the average amount of time/delay a driver has to wait before an adequate gap in the conflicting traffic occurs, allowing the driver to proceed. The following lists the LOS for a two way STOP controlled intersection:

LOS A - Average Delay (Seconds/Vehicle) 0-10
LOS B - Average Delay (Seconds/Vehicle) >10-15
LOS C - Average Delay (Seconds/Vehicle) >15-25
LOS D - Average Delay (Seconds/Vehicle) >25-35
LOS E - Average Delay (Seconds/Vehicle) >35-50
LOS F - Average Delay (Seconds/Vehicle) >50

In meetings with Council Leadership, County Administration, and the Transportation Board Chair, the NMDOT and FHWA have stated that for the County to receive federal funding for a road construction projec...

Click here for full text