Title
NM4 Crossing and Multi-Use Trail Improvements
Body
Keith Wilson, Project Manager will provide an update on the project which includes the design and construction of both new and reconstructed multi-use trails along NM4 between Sherwood Blvd. and La Vista Dr. and within Piñon Park in White Rock.
At this meeting the following will be presented:
• Reevaluation of the location for the Pedestrian Hybrid Beacon Crossing (HAWK Signal)
• Reevaluation of the NM4 Westbound Lane Reduction between Sherwood Blvd and La Vista Dr.
• Reevaluation of the Trail location along the northside of NM4
• Update on the Pinon Elementary School Trail
Attachments
A - Presentation - NM4 Crossing and Multi-Use Trail Improvements